View 5 Year Paving Program Fiscal Years 2019– 2023

FY 2019 - $740,000

Fitzhugh St. (Wood St. to Martin Luther King Jr Blvd)

LaCosta Island Ct

Burland St. (Elizabeth St. to Cooper St.)

Hazel St. (Myrtle St. to Allen St.)

Allen St. (Taylor Rd. to Cooper St.)

Brown Ave. (Marion Ave. to Olympia Ave.)

Ida Ave. (Mary St. to Martin Luther King, Jr. Boulevard

E. Charlotte Ave (Cooper St to US 41 N)

Virginia St (US 41 NB to US 41 SB – includes the Taylor Ave intersection)

Chasteen St. (W. Marion Ave to W Virginia St) - Due to extremely poor condition this street will be skim-resurfaced until a time when street bricking can be accomplished.

Ryan Dr (LaCosta Island Ct to cul-de-sac)

Acalypha

Paspalum

Coral Tree

Rejuvenation (Location TBD)

Street Bricking – Goldstein between Marion and Olympia Ave. Street bricking and restoration can be accomplished as Public Works resources are available. Due to past 17/18 Hurricane activity - street bricking was deferred. Street bricking is very labor, time and coordination extensive.

 

Click image above to view powerpoint

Click image below to view full map

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Flash Player Windows Media Player Microsoft Silverlight Word Viewer Excel Viewer PowerPoint Viewer